Malaysia Opens Final LSS6 Bidding Window For Standalone Solar Package

Package 3’s bidding window closes August 28, marking the final stage of Malaysia’s LSS6 solar program.

PLN Advances Plan To Cut Business Entities From 44 To 23

PLN’s entity reduction plan ties into broader efforts to simplify decision-making across major Indonesian SOEs.

Meralco Cuts August Rate By PHP0.0428 Per KWH On ERC-Ordered Refund

Meralco’s August rate falls to P14.7833 per kWh as an ERC-ordered refund offsets rising pass-through charges.

DOE Seeks ‘Tougher’ Stance In Energy Governance To Protect Consumers

The department is pressing generation companies to comply with reporting rules as part of efforts to strengthen energy sector governance.
SEND TO: pressreleases@pageonemedia.ph

Apo Island Board Allocates Funds For Viable Berthing Space Study

Naglaan ang Apo Island PAMB ng PHP130,000 para sa pag-aaral ng angkop na berthing space para sa mga bangkang bumibisita sa isla.

Apo Island Board Allocates Funds For Viable Berthing Space Study

2,548
2,548

How do you feel about this story?

Express Your Reaction
Like
Love
Haha
Wow
Sad
Angry

The Protected Area Management Board (PAMB) of Apo Island in Dauin, Negros Oriental, has allocated some PHP 130,000 for a work and financial plan to determine the type of docking space for motorboats coming to the island.

Charlie Fabre, regional executive director of the Department of Environment and Natural Resources-Negros Island Region (DENR-NIR), told the Philippine News Agency in an interview on Wednesday that Apo Island must have a floating wharf or any similar structure that can accommodate motorboats.

“Without a docking facility on the island, the current practice of motorboats dropping anchor off the shores of the island contributes to further degradation of the corals,” Fabre said.

At a recent PAMB meeting, the board agreed to finance a study to identify the most suitable type of berthing facility on the island that supports development while being environmentally sustainable, he added.

Fabre said the offer is made to the Silliman University Institute of Environmental and Marine Sciences (SUIEMS), headed by Dr. Aileen Maypa.

Maypa has yet to respond to the board’s invitation to conduct the study, he added.

The DENR-Biodiversity Management Bureau (DENR-BMB) halted the Apo Island jetty port project in July of this year because of environmental breaches.

The DENR-BMB released a Cease and Desist Order for the project, which was challenged by marine specialists from Silliman University and various environmental organizations because of the project’s effect on the island’s abundant marine biodiversity.

Fabre mentioned that a movable floating dock, which could be relocated across the island based on the season or weather, might be a possibility, and that helix pins should replace drilling altogether.

He is hopeful that the study will be finished in the coming months to allow for a docking facility to be established in Apo Island, which is declared by law as a protected landscape and seascape. (PNA)